Build operate transfer BOT
[edit] Introduction
A build, operate and transfer (BOT) contract is a project delivery model that is typically used for large projects developed through Public Private Partnerships (PPPs). The term 'Public Private Partnerships' refers to a very broad range of partnerships in which the public and private sectors collaborate for some mutual benefit.
Under a BOT contract, a private organisation undertakes to complete a project, such as an infrastructure project, for which they are granted a concession to finance and build by a public sector partner, typically a government department. The public partner may provide limited funding or other benefits (such as tax exemptions) but the private organisation accepts most of the risks.
The private organisation is then granted the right to operate the project for a specific period of time and they receive a concession for that.
[edit] Applications
This form of arrangement is used in some parts of the United States and in other regions of the world.
One early example of the method is the China Hotel in Guangzhou, Guangdong, China. Completed in 1984, the five-star hotel was delivered under a DOT arrangement between the local Guangzhou municipal government and several foreign entities. It was the first venture with foreign investment and management in China.
One of the leading sources of funds on the project, Hopewell Holdings Ltd of Hong Kong, operated the property for a fixed period of time upon its completion. In 1998, Marriott took over management of the property through to 2018. After that point, the ownership and management of the hotel was taken over by Guangzhou Lingnan International Enterprise Group Co. Ltd.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.